Embargoed and Restricted Access
Reason: Under embargo until 31 July 2023. After this date a copy can be supplied under Section 51(2) of the Australian Copyright Act 1968 by submitting a document delivery request through your library.
Improvement of Passivhaus simulation to narrow building performance gap
Passivhaus (PH) design is rapidly spreading worldwide as its beneficial outcomes have been predicted by numerous simulation studies. However, actual building performances often deviate from the simulated results. This disparity between estimated and actual performance is defined as the ‘performance gap’. This work combines modelling efforts with a two-year monitoring campaign, and uses Australia’s first certified large PH building as the demonstration case to advance the robustness of PH simulation. The outcomes of this research could guide the improvement of future PH simulation models and assist designers in building renovation.