Test Cases for Capacity Expansion Planning with Unit Commitment.pdf (547.2 kB)
Test Cases for Capacity Expansion Planning with Unit Commitment
online resource
posted on 2019-05-16, 02:03 authored by Semini WijekoonSemini Wijekoon, Ariel LiebmanAriel Liebman, Simon DunstallIn this paper, six test cases; 6 bus, 6 bus ww, 14 bus, 15 bus, 21 bus and 24 bus were updated for capacity expansion planning problems with unit commitment. The test cases were collected from multiple sources and the obtained data was considered as the existing system. Existing thermal units were updated for unit commitment formulation and candidate thermal units, renewable units, battery storage units and transmission lines were added for the planning problem.
Funding
Monash University , Data 61 CSIRO
History
Usage metrics
Categories
Keywords
generation, transmission and storage expansion planningtest casesunit commitmentrenewable energyPower and Energy Systems Engineering (excl. Renewable Power)Renewable Power and Energy Systems Engineering (excl. Solar Cells)Electrical and Electronic Engineering not elsewhere classifiedEnergy Generation, Conversion and Storage Engineering